Betoniarnia z mieszarką pierścieniową
Krupp - Teka
THZ 3000
Niemcy
1980
używany
na żądanie
INNO26189
Complete, robust concrete preparation plant for the ready-mix concrete sector. Key data: Tower plant made by Krupp - built in 1969 with 5 silos, control system originally built by Pfister Waagen Augsburg, control system currently Dorner Electronic - Dorner Control, high-performance pan type mixer Teka THZ 3000 - built in 1980. Unfortunately, technical drawings of the entire tower are no longer available. Spare parts lists are still available. Spare parts are also still available from the manufacturers.