Innovac GmbH Used machines from Germany
Innovac used-machines Complete production lines [1 - 2 of 2]
Plastic-Drying-and-Conveying-System-Werner-Koch-A-MV used
Plastic Drying and Conveying System
Werner Koch A/MV
Germany
2003
used
on request
INNO31990
A complete central plastic granulate drying and conveying system Werner Koch, which was extensively expanded and modernized in 2021, is available. 1) Koch CKT 300 dry air dryer, year of manufacture: 2003, power: 41kW, air capacity: 300m³/h. 2) Koch CKT 500 dry air dryer, year of manufacture: 2021, power: 51kW, air capacity: 500m³/h, control system: Siemens S7. 3) 26x drying hoppers, volume: 11x40l, volume: 13x100l, volume: 2x150l. 4) 38x machine hoppers. 5) 2x Busch vacuum pumps. 6) Automatic Koch Navigator material distribution system, inputs: 26, outputs: 38. Including control cabinets and a central visualization and monitoring system Supervisione 9-7000. Documentation available. An on-site inspection is possible.
Dosing-and-Casting-System-Respecta-Epoxidharz used
Dosing and Casting System
Respecta Epoxidharz
Germany
2019
used
on request
INNO30997
A complete Respecta epoxy resin metering and casting system is available. 1) Big bag station for supplying fillers, max. particle size: 0.7mm, max. bulk density: 0.5g/cm³. 2) Two IBC connections for liquid components A and B with diaphragm pumps. 3) Two buffer tanks for A and B, volume: approx. 230l. Including level sensors and automatic IBC filling. 4) Volumetric metering to the mixing screw with flow meter and pressure monitoring. 5) Degassing unit. 6) Continuous epoxy resin inline heater with process monitoring of the resin temperature and the epoxy hardener, viscosity range: approx. 350-450mPas, max. epoxy resin temperature: 20°C. 7) Semi-automatic flushing and cleaning unit for the casting unit, volume: approx. 50l. Overall system control: Siemens Simatic S7, additional controls: control cabinets/frequency converters/industrial PC, overall system casting capacity: approx. 30l/min. The system allows mechanical preparation for retrofitting up to 3 additional filler metering systems. It is recommended to renew the lines and the diaphragm pumps before commissioning. Documentation available. An on-site inspection is possible.